Lavington Five Roads Association v Director General, National Environment Management Authority & 7 others [2026] KEELC 7752 (KLR)

Included with active membership. View daily and monthly plans · Sign in

Court
Environment and Land Court at Nairobi
Case number
Elcep Appeal E050 of 2026
Judgment date
12 November 2026
Judge(s)
Mohammed N. Kullow

What the court decided

Overall outcome and orders

The Notice of Motion dated 28 May 2026 was allowed. A temporary injunction restrained the 3rd–5th Respondents, Interested Parties and those acting for them from further demolition, excavation, construction, development or other construction activity on L.R. No. 3734/736 (now Nairobi Block 12/257) pending the appeal. The parties were directed to facilitate expeditious determination of NET Appeal No. E025 of 2026; application costs were to abide the appeal’s outcome.

Supporting judgment passages

27. In the upshot, I find that the Appellant/Applicant's Notice of Motion dated 28th May 2026 is merited and the same is hereby allowed in the following terms:

Passage 54 →

a) An order of temporary injunction is hereby issued restraining the 3rd , 4th and 5th Respondents, the Interested Parties, their agents, servants, employees, contractors or any persons acting under their authority from undertaking any further demolition, excavation, construction, development or other construction activities on L.R. No. 3734/736 (now Nairobi Block 12/257), situated along Maji Mazuri Road, Lavington, Nairobi.

Passage 55 →

c) The costs of the application shall abide the outcome of the appeal.It is so ordered.

Passage 57 →
Issue 1Whether the Appellant/Applicant had established sufficient grounds for grant of interlocutory injunctive orders pending hearing and determination of the appeal.

Held. Decided. The Applicant established grounds for interlocutory injunctive relief. It showed a prima facie case through substantial, though disputed, questions about environmental assessment, planning compliance, public participation and anticipated environmental effects. Continued construction risked irreparable injury because completion could make restoration difficult if approvals were ultimately found non-compliant. The balance of convenience favoured preserving the property rather than permitting physical alteration while the appeal remained unresolved. The Court granted a temporary injunction; it did not finally determine the legality of the EIA licence or development approvals.

Ratio. Interlocutory injunction requirements are distinct and sequential: the applicant must establish a prima facie case, irreparable injury not adequately compensable by damages, and, if necessary, a balance of convenience favouring relief. A prima facie case exists where the material discloses an apparently infringed right requiring an answer. Where contested environmental and planning approvals concern ongoing physical development, temporary preservation is justified if completion may make restoration difficult and undermine the effective determination of the appeal; granting preservation is not a final finding that the approvals are unlawful.

Supporting passages

Issue

Supporting judgment passages

14. I have carefully considered the application, the supporting and replying affidavits, the rival submissions and the authorities cited by the parties. The sole issue for determination is whether the Appellant/Applicant has established sufficient grounds for the grant of interlocutory injunctive orders pending the hearing and determination of the appeal.

Paragraph 14 →

Held

Supporting judgment passages

27. I am consequently satisfied that the balance of convenience favours preservation of the suit property pending determination of the appeal. Such preservation does not amount to a finding that the Environmental Impact Assessment licence or the development approvals were unlawfully issued. It merely ensures that the subject matter remains protected and that the eventual determination of the appeal is not rendered ineffective by intervening developments. Accordingly, I find that the Appellant/Applicant has established sufficient grounds for the grant of interlocutory injunctive relief.

Paragraph 27 →

a) An order of temporary injunction is hereby issued restraining the 3rd , 4th and 5th Respondents, the Interested Parties, their agents, servants, employees, contractors or any persons acting under their authority from undertaking any further demolition, excavation, construction, development or other construction activities on L.R. No. 3734/736 (now Nairobi Block 12/257), situated along Maji Mazuri Road, Lavington, Nairobi.

Passage 55 →

Ratio

Supporting judgment passages

15. The principles governing the grant of interlocutory injunctions are well settled. In Giella Vs Cassman Brown & Co. Ltd [1973] EA 358, the Court established that an applicant must demonstrate a prima facie case with a probability of success, that they stand to suffer irreparable injury incapable of adequate compensation by an award of damages and, where the Court is in doubt, that the balance of convenience favours the grant of an injunction. These principles were reiterated by the Court of Appeal in Nguruman Limited Vs Jan Bonde Nielsen & 2 Others [2014] eKLR, which emphasised that the three requirements are distinct and must be considered sequentially.

Paragraph 15 →

16. In Mrao Ltd. Vs First American Bank of Kenya Ltd & 2 Others [2003] KLR 125, the Court of Appeal explained that a prima facie case is established where the material presented discloses a right which has apparently been infringed by the opposite party, calling for an explanation or rebuttal.

Paragraph 16 →

22. I note that the correspondence dated 11th November 2025, indicating that no Environmental Impact Assessment application was then on record, preceded NEMA's acknowledgment of the application on 20th November 2025. The earlier correspondence does not, by itself, establish that the subsequent licensing process was unlawful. Equally, the mere issuance of a licence does not conclusively resolve the questions raised regarding compliance with the statutory requirements. Whether the public participation undertaken was adequate and whether the environmental concerns were sufficiently addressed are matters requiring substantive examination.

Paragraph 22 →
READ THE DECISION FASTER

Case at a glance

Read the full text ↓

Selected passages from the judgment. Follow each paragraph link to read the full context.

Background

Before this Court for determination is the Appellant/Applicant’s Notice of Motion dated 28th May 2026, brought pursuant to Order 51 Rule 1 of the Civil Procedure Rules, Section 130 of the Environmental Management and Co-ordination Act and Section 13(1) of the Environment and Land Court Act, seeking, inter alia, temporary injunctive and conservatory orders restraining the 3rd, 4th and 5th Respondents, the Interested Parties, their…

Paragraph 1 →

Question before the court

I have carefully considered the application, the supporting and replying affidavits, the rival submissions and the authorities cited by the parties. The sole issue for determination is whether the Appellant/Applicant has established sufficient grounds for the grant of interlocutory injunctive orders pending the hearing and determination of the appeal.

Paragraph 14 →

Reasoning passage

Of particular relevance is the expert material presented by the Appellant, which identifies specific alleged deficiencies in the planning and environmental assessment processes. The concerns raised extend beyond general dissatisfaction with the development and include the adequacy of the environmental assessment, the applicable planning requirements and the anticipated effects upon the surrounding area. Although these allegations are…

Paragraph 23 →
SHERIAPLEX EDITORIAL BRIEF

Preview the case brief

Questions presented

Whether the Appellant/Applicant had established grounds for an interlocutory injunction pending determination of NET Appeal No. E025 of 2026, including a prima facie case, irreparable injury, and a favourable balance of convenience.

Material facts

Lavington Five Roads Association challenged an Environmental Impact Assessment licence for a swimming academy and gymnasium on L.R. No. 3734/736 (now Nairobi Block 12/257), Maji Mazuri Road, Lavington. It alleged deficient public participation, planning and…

Get the complete brief with membership →

Full judgment

REPUBLIC OF KENYA

IN THE ENVIRONMENT AND LAND COURT

AT MILIMANI LAW COURTS, NAIROBI

ELCEP APPEAL NO. E050 OF 2026

LAVINGTON FIVE ROADS ASSOCIATION ...........................APPELLANT/APPLICANT

-VERSUS-

DIRECTOR GENERAL,
NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ...
........1ST RESPONDENT

NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ..........2ND RESPONDENT

MOHAMED RASHEED CHAUDHRI ...............................................3RD RESPONDENT

TAUKEER CHAVDHRI ...................................................................4TH RESPONDENT

LEDANIE CONSTRUCTION LIMITED .............................................5TH RESPONDENT

PRO SWIM ACADEMY KENYA LIMITED .................................1ST INTERESTED PARTY

POLYKENS OCHIENG OTIENO ............................................2ND INTERESTED PARTY

SAMUEL ODUOR OTIENO ...................................................3RD INTERESTED PARTY

RULING

The Application

1. Before this Court for determination is the Appellant/Applicant’s Notice of Motion dated 28th May 2026, brought pursuant to Order 51 Rule 1 of the Civil Procedure Rules, Section 130 of the Environmental Management and Co-ordination Act and Section 13(1) of the Environment and Land Court Act, seeking, inter alia, temporary injunctive and conservatory orders restraining the 3rd, 4th and 5th Respondents, the Interested Parties, their agents, servants, employees and persons acting under their authority from undertaking further demolition, excavation, construction or development activities on L.R. No. 3734/736 (now Nairobi Block 12/257), situated along Maji Mazuri Road, Lavington, Nairobi, pending the hearing and determination of NET Appeal No. E025 of 2026 before the National Environment Tribunal.

2. The application is premised on the grounds that the Appellant had previously moved the National Environment Tribunal through an application dated 20th February 2026, seeking status quo orders to halt the ongoing development of a swimming pool and gymnasium on the suit property. The Tribunal dismissed the application through its ruling delivered on 24th April 2026, prompting the Appellant to lodge the present appeal. The Appellant contends that the Tribunal erred in declining to grant preservatory orders despite the alleged irregularities in the environmental approval process and the evidence presented concerning the adverse effects of the proposed development. It is further contended that continued construction would substantially alter the character of the surrounding residential neighbourhood and render the appeal nugatory.

3. The application is supported by the affidavit of Elijah Kimani, the Chairman of the Appellant Association, sworn on 28th May 2026, who reiterates the grounds of the application. He deposes that the Tribunal failed to adequately consider the evidence presented by the Appellant, including an expert report prepared by John K. Barreh, which raised concerns regarding the environmental implications of the proposed development and the legality of the approvals issued.

4. He further avers that the Environmental Impact Assessment licensing process was procedurally defective, particularly regarding public participation, and that the Tribunal failed to appreciate the objections raised by neighbouring residents and the recommendations made by the relevant planning authorities.

5. The deponent further avers that the 3rd to 5th Respondents have continued with excavation and construction activities notwithstanding the pendency of the appeal, thereby exposing the Appellant and neighbouring residents to irreversible changes to their environment. He maintains that unless the Court intervenes, the development may be completed before the appeal is heard and determined, occasioning irreparable harm incapable of adequate compensation by an award of damages. He consequently contends that the balance of convenience favours preserving the suit property in its existing state pending determination of the appeal and urges the Court to allow the application.

The Response

5. The application is opposed through a Replying Affidavit sworn on 10th June 2026 by Samuel Oduor Otieno, the 3rd Interested Party and a director of the 1st Interested Party, on his own behalf and on behalf of the other Interested Parties. He deposes that the 1st Interested Party is a duly incorporated company undertaking the development of a swimming academy and training facility on L.R. No. 3734/736 (now Nairobi Block 12/257), situated along Maji Mazuri Road, Lavington, Nairobi. He avers that the 1st Interested Party lawfully occupies the premises pursuant to a tenancy agreement with the registered proprietor and has invested substantial financial resources towards the implementation of the project.

6. The deponent avers that prior to commencement of the development, the project proponents initiated the Environmental Impact Assessment process in accordance with Section 58 of the Environmental Management and Co-ordination Act. He states that the process commenced on 5th November 2025, the requisite fees were paid on 14th November 2025, and the National Environment Management Authority acknowledged receipt of the application on 20th November 2025. He maintains that the Environmental Impact Assessment licence was subsequently issued after consideration of the project report and compliance with the applicable statutory requirements. He further contends that construction activities commenced after the requisite regulatory approvals had been obtained.

7. On the question of public participation, the deponent denies the allegations that the process was inadequate or irregular. He avers that neighbouring residents were consulted through questionnaires, public notices displayed at the premises and an advertisement published in the Standard Newspaper inviting public comments. He states that seven households responded to the questionnaires without raising objections and that the project proponents also engaged the Executive Committee of the Appellant Association. He maintains that the applicable legal framework requires reasonable consultation with persons likely to be affected by the project and that the process undertaken satisfied that requirement.

8. The deponent further disputes the allegations concerning excessive water consumption, traffic congestion, sewerage, security, invasion of privacy and adverse environmental effects. He maintains that the proposed facility is intended to operate as a structured swimming academy rather than an unrestricted public swimming pool, with controlled training sessions accommodating a limited number of participants at staggered intervals. He further avers that adequate parking facilities have been provided within the premises and that the Environmental Impact Assessment Report addressed the anticipated environmental concerns and proposed appropriate mitigation measures. He contends that the allegations of irreparable harm are speculative and unsupported by evidence.

9. Finally, the deponent avers that the Interested Parties have already incurred substantial expenditure towards the project and continue to bear financial obligations arising from the tenancy and other contractual commitments. He maintains that continued suspension of the development would occasion significant financial prejudice to the Interested Parties notwithstanding the regulatory approvals obtained. He consequently contends that the Appellant has failed to establish sufficient grounds for the grant of interlocutory injunctive orders and urges the Court to dismiss the application with costs.

Submissions

Appellant/Applicant’s Submissions

10. The application was canvassed by way of written submissions. The Appellant filed its written submissions dated 14th October 2026, identifying three issues for determination, namely, whether it had established a prima facie case, whether it would suffer irreparable harm if the orders sought were declined, and whether the balance of convenience tilted in its favour.

11. The Appellant submitted that the Environmental Impact Assessment licence was issued without adequate public participation and in contravention of the applicable environmental and planning laws. It contended that the proposed development was incompatible with the character of the surrounding residential neighbourhood and that the Environmental Impact Assessment Report failed to adequately address concerns relating to water consumption, drainage, sewerage, traffic, security and privacy. In support of its submissions on the existence of a prima facie case, the Appellant relied on Nguruman Limited Vs Jan Bonde Nielsen & 2 Others [2014] eKLR and Mrao Ltd. Vs First American Bank of Kenya Ltd & 2 Others [2003] KLR 125.

12. On irreparable harm and the balance of convenience, the Appellant submitted that continued construction would permanently alter the character of the neighbourhood and render the appeal nugatory before its determination. It maintained that the anticipated environmental degradation could not adequately be compensated by an award of damages and that the precautionary principle under Articles 42, 69 and 70 of the Constitution favoured preservation of the suit property. The Appellant relied on Stanley Kangethe Kinyanjui Vs Tony Ketter & 5 Others [2013] KECA 378 (KLR) on the circumstances in which an appeal may be rendered nugatory and Somche Investments Limited Vs Gikambura Properties Limited & 2 Others [2026] KEELC 631 (KLR) on the balance of convenience. It urged the Court to allow the application with costs to the Respondents.

1st, 2nd and 3rd Interested Parties’ Submissions

12. The 1st, 2nd and 3rd Interested Parties filed their written submissions dated 25th September 2026, opposing the application. They identified three issues for determination, namely, whether the Appellant had established a prima facie case, whether it had demonstrated irreparable harm incapable of compensation by damages, and whether the balance of convenience and interests of justice favoured granting the orders sought.

13. They submitted that the Appellant had failed to satisfy the threshold for interlocutory injunctive relief, arguing that the project had undergone the requisite environmental assessment and regulatory approval processes. They further maintained that public participation had been undertaken through questionnaires, public notices, newspaper advertisements and consultations with representatives of the Appellant Association. They relied on Giella Vs Cassman Brown & Co. Ltd [1973] EA 358, Mrao Ltd. Vs First American Bank of Kenya Ltd & 2 Others [2003] KLR 125 and British American Tobacco Kenya PLC Vs Cabinet Secretary for the Ministry of Health & 2 Others [2019] KESC 15 (KLR).

14. On irreparable harm and the balance of convenience, the Interested Parties submitted that the allegations concerning water consumption, traffic congestion, security, privacy and environmental degradation were speculative and unsupported by evidence of imminent injury. They maintained that the proposed facility would operate as a controlled swimming academy with limited participants and adequate mitigation measures.

15. They further submitted that halting construction would occasion substantial financial prejudice, having incurred considerable development expenditure and continuing rental obligations of Kshs.600,000 monthly. Relying on Nguruman Limited Vs Jan Bonde Nielsen & 2 Others [2014] eKLR, they argued that the requirements for interlocutory injunctive relief must be established sequentially and that the Appellant had failed to satisfy them. They consequently urged the Court to dismiss the application with costs and discharge the interim orders.

Analysis and Determination

14. I have carefully considered the application, the supporting and replying affidavits, the rival submissions and the authorities cited by the parties. The sole issue for determination is whether the Appellant/Applicant has established sufficient grounds for the grant of interlocutory injunctive orders pending the hearing and determination of the appeal.

15. The principles governing the grant of interlocutory injunctions are well settled. In Giella Vs Cassman Brown & Co. Ltd [1973] EA 358, the Court established that an applicant must demonstrate a prima facie case with a probability of success, that they stand to suffer irreparable injury incapable of adequate compensation by an award of damages and, where the Court is in doubt, that the balance of convenience favours the grant of an injunction. These principles were reiterated by the Court of Appeal in Nguruman Limited Vs Jan Bonde Nielsen & 2 Others [2014] eKLR, which emphasised that the three requirements are distinct and must be considered sequentially.

16. In Mrao Ltd. Vs First American Bank of Kenya Ltd & 2 Others [2003] KLR 125, the Court of Appeal explained that a prima facie case is established where the material presented discloses a right which has apparently been infringed by the opposite party, calling for an explanation or rebuttal.

17. The present dispute concerns the issuance of an Environmental Impact Assessment licence authorising the development of a swimming academy and gymnasium on L.R. No. 3734/736 (now Nairobi Block 12/257). The Appellant challenges the legality of the licensing process, particularly the adequacy of public participation, compliance with planning requirements and consideration of the anticipated environmental effects. These matters must be considered within the framework of Articles 42, 69 and 70 of the Constitution, which safeguard the right to a clean and healthy environment and provide for its protection.

18. The material before the Court shows that the National Environment Tribunal, in its ruling delivered on 24th April 2026, acknowledged that the Appellant had raised arguable issues concerning the environmental licensing process. However, the Tribunal declined to grant interlocutory relief, finding that the competing factual accounts required determination at the substantive hearing and that the alleged irreparable harm had not been sufficiently demonstrated. The question before this Court is therefore whether the material presented justifies preservation of the subject matter pending determination of the appeal.

19. The Appellant relies on objections raised by neighbouring residents, the communication dated 7th November 2025 from the Chief Officer for Urban Development and Planning recommending further public participation, and the correspondence dated 11th November 2025 indicating that an Environmental Impact Assessment application was not then on record. It further relies on the expert report prepared by John K. Barreh, dated 19th February 2026, which raises concerns regarding compliance with planning requirements, public participation, water availability, drainage, sewerage and the compatibility of the proposed development with the surrounding residential neighbourhood.

20. On their part, the Interested Parties have exhibited material demonstrating that an Environmental Impact Assessment process was undertaken, culminating in the issuance of the requisite licence.

21. They maintain that public participation was conducted through questionnaires, public notices, newspaper advertisements and engagement with representatives of the Appellant Association. They further contend that the development has received the necessary approvals and that measures have been incorporated to address the anticipated environmental concerns.

22. I note that the correspondence dated 11th November 2025, indicating that no Environmental Impact Assessment application was then on record, preceded NEMA's acknowledgment of the application on 20th November 2025. The earlier correspondence does not, by itself, establish that the subsequent licensing process was unlawful. Equally, the mere issuance of a licence does not conclusively resolve the questions raised regarding compliance with the statutory requirements. Whether the public participation undertaken was adequate and whether the environmental concerns were sufficiently addressed are matters requiring substantive examination.

23. Of particular relevance is the expert material presented by the Appellant, which identifies specific alleged deficiencies in the planning and environmental assessment processes. The concerns raised extend beyond general dissatisfaction with the development and include the adequacy of the environmental assessment, the applicable planning requirements and the anticipated effects upon the surrounding area. Although these allegations are disputed, they raise substantial questions concerning compliance with the statutory safeguards governing the proposed development. Without making any final determination on the validity of the approvals, I am satisfied that the Appellant has demonstrated a prima facie case warranting consideration of interim protection.

24. Turning to irreparable harm, the Appellant contends that continued excavation and construction will fundamentally alter the character of the suit property and its surrounding environment before the appeal is determined. The Interested Parties maintain that the anticipated harm is speculative and that the proposed facility will operate under controlled conditions with appropriate mitigation measures. While the existence of an environmental complaint does not automatically justify an injunction, the Court must consider whether the threatened injury is sufficiently demonstrated and whether subsequent relief would adequately address it.

25. In the circumstances of this case, the development involves physical alterations to the suit property, the environmental and planning implications of which form the subject of the pending proceedings. Should construction proceed to completion before those questions are determined, restoration of the previous position may prove difficult, particularly if the development is ultimately found to have proceeded contrary to the applicable statutory requirements. The concerns raised in the expert material provide a sufficient basis for apprehending prejudice beyond a merely speculative possibility. I am therefore persuaded that the risk of irreparable injury warrants temporary preservation of the subject matter.

26. As regards the balance of convenience, I have considered the Interested Parties' contention that suspension of the development will occasion financial prejudice arising from expenditure already incurred and continuing rental obligations of Kshs.600,000 per month. Those interests are legitimate and cannot be disregarded. However, the financial prejudice occasioned by a temporary suspension must be weighed against the possibility of substantial physical alteration of the property before the legality of the development is determined. In my view, the greater risk lies in allowing the construction to proceed to completion when the issues concerning the environmental and planning approvals remain unresolved.

27. I am consequently satisfied that the balance of convenience favours preservation of the suit property pending determination of the appeal. Such preservation does not amount to a finding that the Environmental Impact Assessment licence or the development approvals were unlawfully issued. It merely ensures that the subject matter remains protected and that the eventual determination of the appeal is not rendered ineffective by intervening developments. Accordingly, I find that the Appellant/Applicant has established sufficient grounds for the grant of interlocutory injunctive relief.

Final Disposition

27. In the upshot, I find that the Appellant/Applicant's Notice of Motion dated 28th May 2026 is merited and the same is hereby allowed in the following terms:

a) An order of temporary injunction is hereby issued restraining the 3rd , 4th and 5th Respondents, the Interested Parties, their agents, servants, employees, contractors or any persons acting under their authority from undertaking any further demolition, excavation, construction, development or other construction activities on L.R. No. 3734/736 (now Nairobi Block 12/257), situated along Maji Mazuri Road, Lavington, Nairobi.

b) The parties shall take the necessary steps to facilitate the expeditious hearing and determination of NET Appeal No. E025 of 2026.

c) The costs of the application shall abide the outcome of the appeal.
It is so ordered.

DATED, SIGNED and DELIVERED virtually at NAIROBI on this 12th day of

November, 2026.

MOHAMMED N. KULLOW

JUDGE

Ruling delivered in the presence of: -

Ms. Njagi for the Appellant/Applicant

Ms. Kimani for the 1st, 2nd, and 3rd Interested Parties

N/A for the 1st, 2nd, 3rd, 4th and 5th Respondents

Ms. Mwangi Court Assistant